category.adminRecords

Compensation schedule for the Jandola–Razmak road alignment

Public Works Department, NWFP · 14 August 1923

Verified source
Scan of Compensation schedule for the Jandola–Razmak road alignment
Original scan · Provincial Archives, Peshawar — PWD series

Transcription

Schedule showing sums sanctioned on account of compensation for cultivated terraces and water-channels acquired for the metalled road between milestone 24 (Sararogha) and milestone 41 (Ladha), payable to the sections named in column 3 through the Political Agent.

Translation

شیڈول جس میں پکی سڑک کے لیے حاصل کی گئی زرعی اراضی اور نالیوں کے معاوضے کی منظور شدہ رقوم درج ہیں، جو سنگ میل ۲۴ (سراروغہ) سے سنگ میل ۴۱ (لدھا) کے درمیان پولیٹیکل ایجنٹ کے ذریعے نامزد قبائلی شاخوں کو قابلِ ادا ہیں۔

Translation is interpretation. Where a claim matters, cite the transcription and the scan alongside it.

Every record in POHAN is linked to the people, places, events and sources it touches.